Comment author: Douglas_Knight 03 May 2015 01:59:20AM 1 point [-]

The operating cost for hydro power plants is very low, so the relevant cost is the initial building. If you dam a river, it just takes one wall, while if you want to create a swimming pool, it takes four. Actually, five, and the floor may be the biggest problem. If you dam a river, you already know that it isn't easy for the water to flow through the ground, because it isn't taking that route. Whereas pumping it onto dry ground probably won't work.

Comment author: bingobongo 03 May 2015 08:07:47AM *  3 points [-]

If you dam a river, you already know that it isn't easy for the water to flow through the ground, because it isn't taking that route.

Actually, this (water that passes under the dam) is the main problem after water passing directly through the dam. If the bed of the river is ok to hold a height of 10 m of water, it is probably not to hold 20 or 30 or 70 m of water.