Morendil comments on Diseased disciplines: the strange case of the inverted chart - Less Wrong
You are viewing a comment permalink. View the original post to see all comments and the full post content.
You are viewing a comment permalink. View the original post to see all comments and the full post content.
Comments (150)
By "cheap and easy" what I mean is "do the very hard work of reasoning out how the world would behave if the hypothesis were true, versus if it were false, and locate the smallest observation that discriminates between these two logically possible worlds".
That's hard and time-consuming work (therefore expensive), but the experiment itself is cheap and easy.
My intuition (and I could well be Wrong on this) tells me that experiments of the sort you are proposing are sort of the opposite: cheap in the front and expensive in the back. What I'm after is a mullet of an experiment, business in front and party in back.
An exploratory experiment might consist of taking notes the next time you yourself fix a bug, and note the answers to a bunch of hard questions: how did I measure the "cost" of this fix? How did I ascertain that this was in fact a "bug" (vs. some other kind of change)? How did I figure out when the bug was introduced? What else was going on at the same time that might make the measurements invalid?
Asking these questions, ISTM, is the real work of experimental design to be done here.
Well, for a recent bug; first, some background:
Then, to answer your questions in order:
Once the problem code was identified, the fix was done in a few minutes. Identifying the problem code took a little longer, as the problem was a rare and sporadic one - it happened first during a particularly irritating test case (and then, entirely by coincidence, a second time on a similar test case, which caused some searching in the wrong bit of code at first)
A numeric value, displayed to the user, was showing "NaN".
The bug was introduced by failing to consider a rare but theoretically possible test case at the time (near the beginning of a long project) that a certain utility function was produced. I could get a time estimate by checking version control to see when the function in question had been first written; but it was some time ago.
A more recent change made the bug slightly more likely to crop up (by increasing the potential for rounding errors). The bug may otherwise have gone unnoticed for some time.
Of course, that example may well be an outlier.
Hmmm. Thinking about this further, I can imagine whole rafts of changes to the specifications which can be made just before final testing at very little cost (e.g. "Can you swap the positions of those two buttons?") Depending on the software development methodology, I can even imagine pretty severe errors creeping into the code early on that are trivial to fix later, once properly identified.
The only circumstances I can think of that might change how long a bug takes to fix as a function of how long the development has run are:
Good stuff! One crucial nitpick:
That doesn't tell me why it's a bug. How is 'bug-ness' measured? What's the "objective" procedure to determine whether a change is a bug fix, vs something else (dev gold-plating, change request, optimization, etc)?
NaN is an error code. The display was supposed to show the answer to an arithmetical computation; NaN ("Not a Number") means that, at some point in the calculation, an invalid operation was performed (division by zero, arccos of a number greater than 1, or similar).
It is a bug because it does not answer the question that the arithmetical computation was supposed to solve. It merely indicates that, at some point in the code, the computer was told to perform an operation that does not have a defined answer.
That strikes me as a highly specific description of the "bug predicate" - I can see how it applies in this instance, but if you have 1000 bugs to classify, of which this is one, you'll have to write 999 more predicates at this level. It seems to me, too, that we've only moved the question one step back - to why you deem an operation or a displayed result "invalid". (The calculator applet on my computer lets me compute 1/0 giving back the result "ERROR", but since that's been the behavior over several OS versions, I suspect it's not considered a "bug".)
Is there a more abstract way of framing the predicate "this behavior is a bug"? (What is "bug" even a property of?)
Ah, I see - you're looking for a general rule, not a specific reason.
In that case, the general rule under which this bug falls is the following:
For any valid input, the software should not produce an error message. For any invalid input, the software should unambiguously display a clear error message.
'Valid input' is defined as any input for which there is a sensible, correct output value.
So, for example, in a calculator application, 1/0 is not valid input because division by zero is undefined. Thus, "ERROR" (or some variant thereof) is a reasonable output. 1/0.2, on the other hand, is a valid operation, with a correct output value of 5. Returning "ERROR" in that case would be a bug.
Or, to put it another way; error messages should always have a clear external cause (up to and including hardware failure). It should be obvious that the external cause is a case of using the software incorrectly. An error should never start within the software, but should always be detected by the software and (where possible) unambiguously communicated to the user.
Granting that this definition of what constitutes a "bug" is diagnostic in the case we've been looking at (I'm not quite convinced, but let's move on), will it suffice for the 999 other cases? Roughly how many general rules are we going to need to sort 1000 typical bugs?
Can we even tell, in the case we've been discussing, that the above definition applies, just by looking at the source code or revision history of the source code? Or do we need to have a conversation with the developers and possibly other stakeholders for every bug?
(I did warn up front that I consider the task of even asking the question properly to be very hard, so I'll make no apologies for the decidedly Socratic turn of this thread.)
No. I have not yet addressed the issues of:
I can think, off the top of my head, of six rules that seem to cover most cases (each additional rule addressing one category in the list above). If I think about it for a few minutes longer, I may be able to think of exceptions (and then rules to cover those exceptions); however, I think it very probable that over 990 of those thousand bugs would fall under no more than a dozen similarly broad rules. I also expect the rare bug that is very hard to classify, that is likely to turn up in a random sample of 1000 bugs.
Hmmm. That depends. I can, because I know the program, and the test case that triggered the bug. Any developer presented with the snippet of code should recognise its purpose, and that it should be present, though it would not be obvious what valid input, if any, triggers the bug. Someone who is not a developer may need to get a developer to look at the code, then talk to the developer. In this specific case, talking with a stakeholder should not be necessary; an independent developer would be sufficient (there are bugs where talking to a stakeholder would be required to properly identify them as bugs). I don't think that identifying this fix as a bug can be easily automated.
If I were to try to automate the task of identifying bugs with a computer, I'd search through the version history for the word "fix". It's not foolproof, but the presence of "fix" in the version history is strong evidence that something was, indeed, fixed. (This fails when the full comment includes the phrase "...still need to fix..."). Annoyingly, it would fail to pick up this particular bug (the version history mentions "adding boundary checks" without once using the word "fix").
That's a useful approximation for finding fixes, and simpler enough compared to a half-dozen rules that I would personally accept the risk of uncertainty (e.g. repeated fixes for the same issues would be counted more than once). As you point out, you have to make it a systematic rule prior to the project, which makes it perhaps less applicable to existing open-source projects. (Many developers diligently mark commits according to their nature, but I don't know what proportion of all open-source devs do, I suspect not enough.)
It's too bad we can't do the same to find when bugs were introduced - developers don't generally label as such commits that contain bugs.
If they did, it would make the bugs easier to find.
If I had to automate that, I'd consider the lines of code changed by the update. For each line changed, I'd find the last time that that line had been changed; I'd take the earliest of these dates.
However, many bugs are fixed not by lines changed, but by lines added. I'm not sure how to date those; the date of the creation of the function containing the new line? The date of the last change to that function? I can imagine situations where either of those could be valid. Again, I would take the earliest applicable date.
I should probably also ignore lines that are only comments.